An elegant white melamine stage and extended flooring installation engineered for grand wedding receptions at Sofitel Bali Nusa Dua.
White Melamine Stage & Flooring at Sofitel
| Year | 2024 |
|---|---|
| Location | Sofitel Bali Nusa Dua Beach Resort |
| Event Type | Weddings |
| About | |
| Scope of Work | Stage structure elevation, complete hall flooring overlay, safety boundary installation, and acoustic damping underlayment. |
| Objective | Build a sturdy yet aesthetically breathtaking elevated stage and dance floor for high-capacity wedding celebrations. |
| Highlights | Heavy load capacity stage, ultra-clean aesthetic matching luxury ballroom decor, seamless transitions between stage and floor. |
| Materials Used | Elevated steel truss staging, high-density white melamine panels, acoustic foam underlayment. |
| Challenges | Strict setup timeline restrictions dictated by hotel ballroom availability. |
| Solutions | Pre-cut modular framing assembled off-site to reduce indoor installation time by 40%. |
| Team Involved | 8 Technical Crew, 2 Stage Engineers, 1 Site Supervisor. |
| Timeline | 8 Hours Setup, 1 Day Event, 4 Hours Dismantling. |